1. |
The Site shall be developed in general accordance with Appendix 1 –Site Plan, to the satisfaction of the Development Officer, in consultation with Subdivision and Development Coordination (Drainage and Transportation). |
2. |
The maximum Floor Area Ratio shall be 0.35. |
3. |
The maximum building Height shall not exceed 12 m. |
4. |
A minimum Setback of 15.0 m shall be provided Abutting the railway property line and a berm shall be provided within the Setback for the purpose of safety. The berm shall be a minimum of 2.0 m in Height from the top of the railway tracks. This facility shall be provided to the satisfaction of the Development Officer, in consultation with Subdivision and Development Coordination, as generally shown on Appendix 1, Site Plan. |
5. |
Minimum Setbacks shall be required as follows: |
|
a. |
6.0 m Abutting 153 Avenue NW, except where a public access easement in a form satisfactory to the City for road right-of-way is accepted by Transportation, in which case the 6.0 m minimum shall be increased by the corresponding width of the easement; |
b. |
1.3 m from the east boundary of the pipeline easement adjacent to 34 Street NW.; and |
c. |
3 m from the south property line. |
|
6. |
No parking, loading, storage, trash collection, outdoor service or display area shall be permitted within a Setback. Loading, storage and trash collection areas shall be located to the rear or sides of the principal building and shall be screened from view from any adjacent Sites or public roadways in accordance with the Provisions of the Zoning Bylaw. . |
7. |
A 1.83 m chain link security fence, located on private property abutting the railway property line shall be provided to the satisfaction of the Development Officer, in consultation with Subdivision and Development Coordination, as generally shown on Appendix 1, Site Plan. |
8. |
Any business premises or multiple occupancy building having a Floor Area greater than 2,000 m2 or a single wall length greater than 20.0 m that is visible from a public road, shall comply with the following criteria: |
|
a. |
the roof line and building façade shall include design elements and add architectural interest; and |
b. |
Landscaping adjacent to exterior walls shall be used to minimize the perceived mass of the building and to create visual interest. |
|
9. |
All mechanical equipment, including roof mechanical units, shall be concealed by screening in a manner compatible with the architectural character of the building or concealed by incorporating it within the building. |
10. |
Provision shall be made for adequate on-Site pedestrian circulation as generally identified on Appendix 1 - Site Plan. Adequate on-Site pedestrian circulation means Hardsurfaced sidewalks or Walkways connecting the main entrance of all on-Site principal buildings to public sidewalks and Walkways adjacent to roadways or within rights-of-ways Abutting the Site. |
11. |
A landscaped Amenity Area of approximately 500 m2 shall be provided as generally identified on Appendix 1 – Site Plan. |
12. |
Notwithstanding Section 55, as amended, and subsections 4.4 and 4.5. of this provision, Landscaping requirements shall be calculated as if these Setbacks were 3 m. |
13. |
Signs shall comply with the regulations found in Schedule 59F, including Sections pertaining to Discretionary Signs. |
14. |
The applicant shall provide a Comprehensive Sign Design Plan, in accordance with the regulations of the Zoning Bylaw, with each application for a Sign. |
15. |
As a condition of the first Development Permit issued after the passing of Charter Bylaw 20206, the owner shall: |
|
a. |
register an easement for all road right-of-way necessary for the construction of a turnaround at the southern terminus of 34 Street NW and the construction of the northbound right turn bay and taper along the east side of 34 Street from the subject site; and |
b. |
Register an easement for all road right-of-way necessary for the construction of a right-in right-out access to 153 Avenue NW, including construction of right turn bay and taper and the relocation of the shared use path from 34 Street to the right-in/right-out access from the subject site to the satisfaction of Subdivision and Development Coordination (Transportation). |
|